I came into Day 2 excited after the great progress that was made on Day 1. We didnt get as much done as I had hoped, but I think that’s mainly due to the stage we are at. Time seems to fly while doing this, but at least we continued to move forward. Starting the day out, I installed the IEC switch at the back, along with the filter. A rectangular shaped cover was made for the power wiring, that will enclose it and protect anyone leaning into the cab (should they do so with the power on).
A coin door was also cut – although I think we will need to use some of the offcuts to cut a better door for the cab. I plan to use MDF, covered in some contact I had originally planned for the control panel. The door will feature a coin mech and lock. On the inside it will also have a counter and a tray to catch coins. This should feature in day 3’s work.



